Here’s a look at some of the past jobs we’re really proud of.
MAZEPPA GAS PLANT / TURN AROUND
We pulled the Sulphur pots away to be rebuilt. The vessels were cleaned and then reinstalled.
Equipment used: 45 ton and 50 ton picker trucks.

SETTING UP AN OIL BATTERY SITE
We set up a lease with four 1000bbl tanks, mcc skids, compressor, separator, and flair stack.
Equipment used: 45 ton and 50 ton picker trucks.

FIBREGLASS TANK INSTALLATION
We lifted and transported an 80 foot long XCL fiberglass tank.
Equipment used: 45 ton picker truck.